Bills Contracting Opportunities for Buffalo Bills New Stadium Project

  CLICK HERE General Interest Form for Opportunities Direct with the Bills

Active Release

RFP #07 – Buffalo Bills Stadium Demolition (Proposal Package 60 – 67)

Arc Building Partners is the project lead for the demolition of the Buffalo Bills’ existing stadium in Orchard Park, NY.  The project includes decommissioning of the existing Buffalo Bills Stadium, demolition & abatement, disconnect and removal of existing utilities applicable such that site can be filled to grade and left for future uses.

Scope of Services includes:
  • 60 – Demolition & Abatement (SC-201): abatement of all asbestos containing materials; demolition of existing stadium structure; haul and disposal of debris not scheduled to remain on site
  • 61 –Temporary Fencing, Permanent Fencing (SC-205): temporary construction fencing and gates; new permanent fencing
  • 62 – Concrete Retaining Wall (SC-301): new retaining wall to close off existing tunnel to administration building that is to remain.
  • 63– Waterproofing of Retaining Wall (SC-701): waterproofing of above new wall
  • 64 –Plumbing & HVAC—Cut/Cap, Make Ready (SC-2201): cut and cap existing utilities to make safe; disconnect existing plumbing/mechanical equipment; reclaim refrigerants, drain glycol; temporary water system
  • 65– Electrical—Cut/Cap, Make Ready (SC-2601): cut and cap existing electrical services and systems to make safe; temporary power
  • 66 – Sitework and Site Utilities (SC-3101): extend new site utilities; site grading and paving outside existing stadium footprint
  • 67 – Spoil Pile Load, Haul, Fill existing stadium (SC-3102): load, haul, fill from existing spoils; pull out fill to existing stadium footprint, including compaction

Timeline Overview:

  • Contractor Information Session: September 24, 2025 at 6:00pm. Click Here to Register
  • Pre-Bid and Meet the Primes Session: Check back soon or register your interest to receive notification updates: Click Here

All businesses interested in submitting as a Prime/Tier-1 subcontractor must prequalify to receive a Request for Proposal (RFP). Prime/Tier-1 Pre-qualification for Buffalo Bills Stadium Demolition: Click Here 

Lower Tier subcontractors and suppliers are not required to submit pre-qualification information. However, all interested lower-tier subcontractors and suppliers are encouraged to register their interest to receive notification updates about upcoming opportunities: Click Here

We encourage NYS-certified minority-, women- and service-disabled veteran-owned and local businesses to participate.

Important note: Information on Prime/Tier-1 subcontractors will be added after bids are opened. Please check the Contracting Opportunities webpage.

For questions, please email: gterbot@arcbldg.com.


RFQ/RFP #06 - Buffalo Bills Public Art Program at New Highmark Stadium: Call for Wall-based Artworks

The Buffalo Bills Public Art Program seeks to commission a professional visual artist, or artist team, to create wall-based artwork at the New Highmark Stadium. Selected artist or artist team's scope will include, but is not limited to, imagining, proposing, designing, engineering, fabricating, and delivery of wall-based artwork.

RFQ/RFP Call for Wall-based Artwork is now closed.
Individual artists/art teams will be contacted for further information if selected.

For information about the Public Art Program visit www.buffalobills.com/new-stadium/public-art-program

Timeline Overview:
Call for Artists: 
Open: February 18, 2025
Applications CLOSED: April 21, 2025
Artists Selected: Summer 2025

For questions, email: stadiumpublicart@gmail.com

RFQ/RFP #05 - Buffalo Bills Public Art Program at New Highmark Stadium: Call for Murals

The Buffalo Bills Public Art Program seeks to commission a professional visual artist, or artist team, to create murals at the New Highmark Stadium. Selected artist or artist team's scope will include, but is not limited to, imagining, proposing, designing, engineering, fabricating, delivery, and installation of the artwork.

RFQ/RFP Call for Murals is now closed.
Individual artists/art teams will be contacted for further information if selected.

For information about the Public Art Program visit www.buffalobills.com/new-stadium/public-art-program.

Timeline Overview:
RFQ/RFP Call for Murals
Open: March 25, 2025
Applications CLOSED: May 19, 2025.
Artist Selected: Summer 2025

For questions, email: stadiumpublicart@gmail.com

RFQ #04 – Buffalo Bills Public Art Program at New Highmark Stadium: Call for Ceiling/Hanging Artwork

The Buffalo Bills Public Art Program seeks to commission a professional visual artist, or artist team, to create hanging sculptural artwork at the New Highmark Stadium. Selected artist or artist team's scope will include, but is not limited to, imagining, proposing, designing, engineering, fabricating, delivery, and installation of the artwork.

RFQ Call for Ceiling-based artwork is now closed.
RFP Semifinalists will be invited to submit a proposal.
Individual artists/art teams will be contacted for further information if selected.

For information about the Public Art Program visit www.buffalobills.com/new-stadium/public-art-program.

Timeline Overview:
Call for Artists:
Open:
February 18, 2025
Applications CLOSED:
March 28, 2025
RFP IN-PROCESS:
Spring 2025
Artists Selected:
Summer 2025

For questions, email: stadiumpublicart@gmail.com

 

RFP #03 – Buffalo Bills New Highmark Stadium Bison Sculptures

The Buffalo Bills Art Program seeks to commission a professional visual artist, or artist team, to create exterior public artwork(s) to be placed at the New Highmark Stadium grounds. Selected artist or artist team's scope will include, but is not limited to, imagining, proposing, designing, engineering, fabricating, delivery, and installation of a herd of large-scale American Bison (buffalo). 

Buffalo Bills New Highmark Stadium Bison Sculpture RFQ is now closed. The RFP is invitation only for shortlisted RFQ semi-finalist applicants: artists/artist teams.

RFP Selection Timeline:
Shortlisted RFQ semi-finalists notified: Week of May 15, 2024
RFP Preparation of proposal materials by semi-finalists: In-Progress
Review of Bison artwork proposal presentations and targeted finalist selection: Summer 2024
Artist Selection: CLOSED

For RFP questions, email: stadiumpublicart@gmail.com

RFP #02 – FF&E Procurement Services

This is a Request for Proposal (RFP) for procurement management for the FF&E of the New Highmark Stadium. This will include, but is not limited to, budget and cost evaluation, sample coordination, sourcing products, value engineering, design coordination, critical path schedule management, accounting, delivery management, warehousing, installation, punch list, and reporting. Inventory, moving, and installation services for existing Owner FF&E items will also be required.

RFP#02 - FF&E Procurement Services is now closed.  Refer to "View Bidder Listing and Awards" for contact information and vendor opportunities.

For vendor opportunity questions, please email: bbs.info@parkerinternational.com

RFP #01 - Food Service Equipment

This is a Request for Proposal (RFP) to furnish and install various equipment for food and beverage spaces throughout the new Highmark Stadium. Scope of work includes, but is not limited to: furnish all labor, materials, equipment, services, and supervision which are necessary for, and incidental to, the delivery, unpacking, setting in place, and installation of Food Service Equipment. All final MEP connections are performed by others. 

RFP#01 - Food Service Equipment is now closed.  Refer to "View Bidder Listing and Awards" for contact information and vendor opportunities.

.


For questions regarding Bills contracting opportunities, please email:
BILLSPROCUREMENT@LEGENDS.NET